Laurel Mountain WF
PJM queue ID P59
Laurel Mountain WF (P59) is listed in the PJM interconnection queue as a 11.7 MW wind project in Barbour County, WV. The filing names Belington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 15, 2011.
| Queue ID | P59 |
|---|---|
| Project name | Laurel Mountain WF |
| Status (as published) | In Service |
| Substation | Belington |
| Point of interconnection | Belington 138kV |
| County | Barbour |
| State | WV |
| Voltage | 138 kV |
| Capacity | 11.7 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2011-06-15 |
| Source dataset | serial |
Same substation and county
Barbour, WV: 9 requests in the PJM queue, 2 active totaling 111.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 97.6 |
| MW capacity | 11.7 |
| MFO | 97.6 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.