Substation Scout

Bethel LF

PJM queue ID P27

Bethel LF (P27) is listed in the PJM interconnection queue as a 13 MW gas project in City of Hampton, VA. The filing names Winchester as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 25, 2008.

Queue IDP27
Project nameBethel LF
Status (as published)In Service
SubstationWinchester
Point of interconnectionWinchester 34.5 kV
CountyCity of Hampton
StateVA
Voltage34.5 kV
Capacity13 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2008-01-25
Source datasetserial

Same substation and county

City of Hampton, VA: 4 requests in the PJM queue, 1 active totaling 13 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy13
MW capacity13
MFO13

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first