1 active project totaling 13 MW in the PJM queue, plus 3 with terminal status (shown grayed).

1active projects
13active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG2-010 Hampton BESS 3 115 76 Battery Withdrawn
AH2-075 Hampton VA 2 n/r 29.1 Battery Withdrawn
AD2-164 Langley AFB Generation 34.5 26.7 Gas Withdrawn
P27 Bethel LF 34.5 13 Gas In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.