Substation Scout

Shady Oaks Wind Power Project

PJM queue ID P26

Shady Oaks Wind Power Project (P26) is listed in the PJM interconnection queue as a 1.9 MW wind project in Lee County, IL. The filing names McGirr-Mendota as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2012.

Queue IDP26
Project nameShady Oaks Wind Power Project
Status (as published)In Service
SubstationMcGirr-Mendota
Point of interconnectionMcGirr-Mendota
CountyLee
StateIL
VoltageNot reported
Capacity1.9 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2012-12-31
Source datasetserial

Same substation and county

McGirr-Mendota substation: 3 requests in the PJM queue, 3 active totaling 21.9 MW.

Queue IDProjectMWResourceStatus
P14Shady Oaks Wind Power Project16WindIn Service
O33Shady Oaks Wind Power Project4WindIn Service

Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy9.5
MW capacity1.9
MFO9.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.