Substation Scout

Minonk Wind Farm

PJM queue ID O50

Minonk Wind Farm (O50) is listed in the PJM interconnection queue as a 40 MW wind project in Woodford County, IL. The filing names Powerton-Dresden as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2012.

Queue IDO50
Project nameMinonk Wind Farm
Status (as published)In Service
SubstationPowerton-Dresden
Point of interconnectionPowerton-Dresden 345kV
CountyWoodford
StateIL
Voltage345 kV
Capacity40 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2012-12-31
Source datasetserial

Same substation and county

Powerton-Dresden substation: 2 requests in the PJM queue, 1 active totaling 40 MW.

Queue IDProjectMWResourceStatus
O23Top Crop Wind Farm60WindWithdrawn

Woodford, IL: 18 requests in the PJM queue, 6 active totaling 279.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity40
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first