Bear Creek WF
PJM queue ID L18
Bear Creek WF (L18) is listed in the PJM interconnection queue as a 5.2 MW wind project in Luzerne County, PA. The filing names Bear Creek as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of February 26, 2006.
| Queue ID | L18 |
|---|---|
| Project name | Bear Creek WF |
| Status (as published) | In Service |
| Substation | Bear Creek |
| Point of interconnection | Bear Creek |
| County | Luzerne |
| State | PA |
| Voltage | Not reported |
| Capacity | 5.2 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2006-02-26 |
| Source dataset | serial |
Same substation and county
Bear Creek substation: 7 requests in the PJM queue, 1 active totaling 5.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J06 | Bear Creek 69kV | 34 | Wind | Withdrawn |
| L05 | Bear Creek 69kV | 25 | Wind | Withdrawn |
| H23 | Bear Creek | 10 | Wind | Withdrawn |
| K09 | Bear Creek | 6.8 | Wind | Withdrawn |
| K15 | Bear Creek 69kV | 6.8 | Wind | Withdrawn |
| AB1-182 | Bear Creek Energy Storage Facility | 0 | Battery | Withdrawn |
Luzerne, PA: 83 requests in the PJM queue, 20 active totaling 8,384.3 MW.
A substation with the same name is named in PJM transmission planning materials: Bear Creek (PPL, 4 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 26 |
| MW capacity | 5.2 |
| MFO | 26 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.