Westminster 34.5 kV
PJM queue ID C01-2251
Westminster 34.5 kV (C01-2251) is listed in the PJM interconnection queue as a 5 MW battery project in Carroll County, MD. The filing names Westminster as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of October 1, 2028.
| Queue ID | C01-2251 |
|---|---|
| Project name | Westminster 34.5 kV |
| Status (as published) | Active |
| Substation | Westminster |
| Point of interconnection | Westminster 34.5 kV |
| County | Carroll |
| State | MD |
| Voltage | 34.5 kV |
| Capacity | 5 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-10-01 |
| Source dataset | cycle |
Same substation and county
Carroll, MD: 4 requests in the PJM queue, 3 active totaling 9.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Manchester LM BESS LLC |
|---|---|
| Transmission owner | BGE |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 5.0 |
| MW capacity | 5.0 |
| MFO | 5.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/22/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.