Kellam 24.9 kV
PJM queue ID C01-2152
Kellam 24.9 kV (C01-2152) is listed in the PJM interconnection queue as a 9.4 MW battery project in Northampton County, VA. The filing names Kellam as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2026.
| Queue ID | C01-2152 |
|---|---|
| Project name | Kellam 24.9 kV |
| Status (as published) | Active |
| Substation | Kellam |
| Point of interconnection | Kellam 24.9 kV |
| County | Northampton |
| State | VA |
| Voltage | 24.9 kV |
| Capacity | 9.4 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-09-30 |
| Source dataset | cycle |
Same substation and county
Northampton, VA: 11 requests in the PJM queue, 3 active totaling 17.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Scout Storage LLC |
|---|---|
| Transmission owner | ODEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 9.44 |
| MW capacity | 9.44 |
| MFO | 9.44 |
| Submitted date | 4/24/2026 |
| Last updated | 6/17/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.