Handsome Lake - Armstrong 345 kV
PJM queue ID C01-2133
Handsome Lake - Armstrong 345 kV (C01-2133) is listed in the PJM interconnection queue as a 250 MW battery project in Venango County, PA. The filing names Handsome Lake - Armstrong as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 30, 2030.
| Queue ID | C01-2133 |
|---|---|
| Project name | Handsome Lake - Armstrong 345 kV |
| Status (as published) | Active |
| Substation | Handsome Lake - Armstrong |
| Point of interconnection | Handsome Lake - Armstrong 345 kV |
| County | Venango |
| State | PA |
| Voltage | 345 kV |
| Capacity | 250 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-30 |
| Source dataset | cycle |
Same substation and county
Venango, PA: 36 requests in the PJM queue, 6 active totaling 871.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | SP Resilient Power 13, LLC |
|---|---|
| Transmission owner | PENELEC |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 250.0 |
| MW capacity | 250.0 |
| MFO | 250.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/11/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.