Boykins 115 kV
PJM queue ID C01-2007
Boykins 115 kV (C01-2007) is listed in the PJM interconnection queue as a 100 MW battery project in southampton County, VA. The filing names Boykins as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2030.
| Queue ID | C01-2007 |
|---|---|
| Project name | Boykins 115 kV |
| Status (as published) | Active |
| Substation | Boykins |
| Point of interconnection | Boykins 115 kV |
| County | southampton |
| State | VA |
| Voltage | 115 kV |
| Capacity | 100 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-03-01 |
| Source dataset | cycle |
Same substation and county
Boykins substation: 8 requests in the PJM queue, 1 active totaling 100 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-208 | Boykins 115 kV | 60 | Solar | Withdrawn |
| AB1-054 | Boykins 115kV | 40.2 | Solar | Withdrawn |
| AB1-028 | Boykins 34.5kV | 14 | Solar | Withdrawn |
| AA2-087 | Boykins 34.5kV | 7.6 | Solar | Withdrawn |
| Z2-099 | Boykins Solar | 5.9 | Solar | Withdrawn |
| AG1-394 | SH-Mehrrin Solar | 5 | Solar | Withdrawn |
| AA2-086 | Boykins Solar | 3.1 | Solar | Withdrawn |
southampton, VA: 1 request in the PJM queue, 1 active totaling 100 MW.
A substation with the same name is named in PJM transmission planning materials: Boykins Substation (DOM, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Viridity Energy Solutions Inc |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 100.0 |
| MW capacity | 100.0 |
| MFO | 100.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.