Substation Scout

Boykins 115 kV

PJM queue ID C01-2007

Boykins 115 kV (C01-2007) is listed in the PJM interconnection queue as a 100 MW battery project in southampton County, VA. The filing names Boykins as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2030.

Queue IDC01-2007
Project nameBoykins 115 kV
Status (as published)Active
SubstationBoykins
Point of interconnectionBoykins 115 kV
Countysouthampton
StateVA
Voltage115 kV
Capacity100 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-03-01
Source datasetcycle

Same substation and county

Boykins substation: 8 requests in the PJM queue, 1 active totaling 100 MW.

Queue IDProjectMWResourceStatus
AD2-208Boykins 115 kV60SolarWithdrawn
AB1-054Boykins 115kV40.2SolarWithdrawn
AB1-028Boykins 34.5kV14SolarWithdrawn
AA2-087Boykins 34.5kV7.6SolarWithdrawn
Z2-099Boykins Solar5.9SolarWithdrawn
AG1-394SH-Mehrrin Solar5SolarWithdrawn
AA2-086Boykins Solar3.1SolarWithdrawn

southampton, VA: 1 request in the PJM queue, 1 active totaling 100 MW.

A substation with the same name is named in PJM transmission planning materials: Boykins Substation (DOM, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperViridity Energy Solutions Inc
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy100.0
MW capacity100.0
MFO100.0
Submitted date4/27/2026
Last updated6/18/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner