Richland - Lockwood 138 kV
PJM queue ID C01-1983
Richland - Lockwood 138 kV (C01-1983) is listed in the PJM interconnection queue as a 58.5 MW hybrid project in Defiance County, OH. The filing names Richland - Lockwood as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2030.
| Queue ID | C01-1983 |
|---|---|
| Project name | Richland - Lockwood 138 kV |
| Status (as published) | Active |
| Substation | Richland - Lockwood |
| Point of interconnection | Richland - Lockwood 138 kV |
| County | Defiance |
| State | OH |
| Voltage | 138 kV |
| Capacity | 58.5 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2030-06-01 |
| Source dataset | cycle |
Same substation and county
Defiance, OH: 21 requests in the PJM queue, 7 active totaling 407.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | DNPB1, LLC |
|---|---|
| Transmission owner | ATSI |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 60.0 |
| MW capacity | 58.48 |
| MFO | 60.0 |
| Submitted date | 4/17/2026 |
| Last updated | 5/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.