Sunbury - Swamp 230 kV
PJM queue ID C01-1804
Sunbury - Swamp 230 kV (C01-1804) is listed in the PJM interconnection queue as a 75 MW solar project in Gates County, NC. The filing names Sunbury - Swamp as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2029.
| Queue ID | C01-1804 |
|---|---|
| Project name | Sunbury - Swamp 230 kV |
| Status (as published) | Active |
| Substation | Sunbury - Swamp |
| Point of interconnection | Sunbury - Swamp 230 kV |
| County | Gates |
| State | NC |
| Voltage | 230 kV |
| Capacity | 75 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-06-01 |
| Source dataset | cycle |
Same substation and county
Gates, NC: 9 requests in the PJM queue, 4 active totaling 661 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Silver Springs Solar Farm, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 125.0 |
| MW capacity | 75.0 |
| MFO | 125.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.