Stuart - Don Marquis 345 kV
PJM queue ID C01-1734
Stuart - Don Marquis 345 kV (C01-1734) is listed in the PJM interconnection queue as a 300 MW nuclear project in Adams County, OH. The filing names Stuart - Don Marquis as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of January 1, 2030.
| Queue ID | C01-1734 |
|---|---|
| Project name | Stuart - Don Marquis 345 kV |
| Status (as published) | Active |
| Substation | Stuart - Don Marquis |
| Point of interconnection | Stuart - Don Marquis 345 kV |
| County | Adams |
| State | OH |
| Voltage | 345 kV |
| Capacity | 300 MW |
| Resource (as published) | Nuclear |
| Resource category | Nuclear (normalized for filtering) |
| Target commercial operation | 2030-01-01 |
| Source dataset | cycle |
Same substation and county
Adams, OH: 21 requests in the PJM queue, 4 active totaling 347 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Oklo Power LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 300.0 |
| MW capacity | 300.0 |
| MFO | 300.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.