Moran 24.94 kV
PJM queue ID C01-1697
Moran 24.94 kV (C01-1697) is listed in the PJM interconnection queue as a 2.4 MW solar project in Prince Edward County, VA. The filing names Moran as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 25, 2028.
| Queue ID | C01-1697 |
|---|---|
| Project name | Moran 24.94 kV |
| Status (as published) | Active |
| Substation | Moran |
| Point of interconnection | Moran 24.94 kV |
| County | Prince Edward |
| State | VA |
| Voltage | 24.9 kV |
| Capacity | 2.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-08-25 |
| Source dataset | cycle |
Same substation and county
Prince Edward, VA: 20 requests in the PJM queue, 6 active totaling 356.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Miller Lake Solar Farm, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 4.0 |
| MW capacity | 2.4 |
| MFO | 4.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/22/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.