South Berwick - Fostoria CTL 345 kV (C01-1691) is listed in the PJM interconnection queue as a 150 MW gas project in Seneca County, OH. The filing names South Berwick - Fostoria CTL as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | C01-1691 |
|---|---|
| Project name | South Berwick - Fostoria CTL 345 kV |
| Status (as published) | Active |
| Substation | South Berwick - Fostoria CTL |
| Point of interconnection | South Berwick - Fostoria CTL 345 kV |
| County | Seneca |
| State | OH |
| Voltage | 345 kV |
| Capacity | 150 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Seneca, OH: 11 requests in the PJM queue, 1 active totaling 150 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | RWE Clean Energy Development, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 200.0 |
| MW capacity | 150.0 |
| MFO | 200.0 |
| Submitted date | 4/25/2026 |
| Last updated | 6/11/2026 |