Seneca, OH interconnection queue
3 active projects totalling 255 MW in the PJM queue, plus 8 with terminal status (shown greyed).
3active projects
255active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1691 | South Berwick - Fostoria CTL 345 kV | 345 | 150 | Gas | Active |
| AG2-289 | Amsden - Fremont Center 69 kV | 69 | 66.6 | Battery | Active |
| AD2-136 | Melmore Tap 138kV | 138 | 46.8 | Wind | Withdrawn |
| AG2-290 | Amsden - Fremont Center 69 kV | 69 | 38.4 | Battery | Active |
| AE2-174 | Fremont Center-Tiffin Center 138 kV circuit #1 | 138 | 34.9 | Wind | Withdrawn |
| AI1-091 | Bascom 69 kV | 69 | 31.5 | Solar | Withdrawn |
| AG2-465 | South Tiffin - West End Fostoria 138 kV | 138 | 29.4 | Hybrid | Withdrawn |
| V4-010 | Republic Wind LLC | 138 | 26 | Wind | Withdrawn |
| AD2-191 | Melmore 138kV | 138 | 22.1 | Wind | Withdrawn |
| U4-028 | Seneca Wind | 138 | 13 | Wind | Withdrawn |
| U4-029 | Seneca Wind | 138 | 13 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.