Fowler 345 kV

PJM queue ID C01-1575

Fowler 345 kV (C01-1575) is listed in the PJM interconnection queue as a 48.7 MW wind project in Benton County, IN. The filing names Fowler as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 1, 2027.

Queue IDC01-1575
Project nameFowler 345 kV
Status (as published)Active
SubstationFowler
Point of interconnectionFowler 345 kV
CountyBenton
StateIN
Voltage345 kV
Capacity48.7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2027-04-01
Source datasetcycle

Same substation and county

Benton, IN: 11 requests in the PJM queue, 4 active totaling 238.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperFowler Ridge IV Wind Farm LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity48.72
MFO150.0
Submitted date4/27/2026
Last updated7/14/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.