Sodus 138 kV

PJM queue ID C01-1350

Sodus 138 kV (C01-1350) is listed in the PJM interconnection queue as a 200 MW battery project in Berrien County, MI. The filing names Sodus as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.

Queue IDC01-1350
Project nameSodus 138 kV
Status (as published)Active
SubstationSodus
Point of interconnectionSodus 138 kV
CountyBerrien
StateMI
Voltage138 kV
Capacity200 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-12-31
Source datasetcycle

Same substation and county

Berrien, MI: 20 requests in the PJM queue, 15 active totaling 1,301 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperJuno Power Management LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy200.0
MW capacity200.0
MFO200.0
Submitted date4/27/2026
Last updated7/9/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.