Harwood - McAdoo Tap 2 69 kV
PJM queue ID C01-1244
Harwood - McAdoo Tap 2 69 kV (C01-1244) is listed in the PJM interconnection queue as a 40 MW hybrid project in Luzerne County, PA. The filing names Harwood - McAdoo Tap 2 as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2031.
| Queue ID | C01-1244 |
|---|---|
| Project name | Harwood - McAdoo Tap 2 69 kV |
| Status (as published) | Active |
| Substation | Harwood - McAdoo Tap 2 |
| Point of interconnection | Harwood - McAdoo Tap 2 69 kV |
| County | Luzerne |
| State | PA |
| Voltage | 69 kV |
| Capacity | 40 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2031-12-31 |
| Source dataset | cycle |
Same substation and county
Luzerne, PA: 83 requests in the PJM queue, 20 active totaling 8,384.3 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-21 | Status change | n/a | Withdrawn → Active |
Additional filed fields
| Developer | Audenried Solar, LLC |
|---|---|
| Transmission owner | PPL |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 40.0 |
| MW capacity | 40.0 |
| MFO | 40.0 |
| Submitted date | 4/23/2026 |
| Last updated | 9/18/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.