Bruce Mansfield 345 kV (C01-1243) is listed in the PJM interconnection queue as a 2,500 MW gas project in Beaver County, PA. The filing names Bruce Mansfield as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of November 15, 2028.
| Queue ID | C01-1243 |
|---|---|
| Project name | Bruce Mansfield 345 kV |
| Status (as published) | Active |
| Substation | Bruce Mansfield |
| Point of interconnection | Bruce Mansfield 345 kV |
| County | Beaver |
| State | PA |
| Voltage | 345 kV |
| Capacity | 2,500 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2028-11-15 |
| Source dataset | cycle |
Same substation and county
Beaver, PA: 27 requests in the PJM queue, 12 active totaling 4,770.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Shippingport Power Station, LLC |
|---|---|
| Transmission owner | ATSI |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 2500.0 |
| MW capacity | 2500.0 |
| MFO | 2500.0 |
| Submitted date | 4/27/2026 |
| Last updated | 5/26/2026 |