Sisisky 115 kV
PJM queue ID C01-1107
Sisisky 115 kV (C01-1107) is listed in the PJM interconnection queue as a 25 MW battery project in Prince George County, VA. The filing names Sisisky as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | C01-1107 |
|---|---|
| Project name | Sisisky 115 kV |
| Status (as published) | Active |
| Substation | Sisisky |
| Point of interconnection | Sisisky 115 kV |
| County | Prince George |
| State | VA |
| Voltage | 115 kV |
| Capacity | 25 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Prince George, VA: 23 requests in the PJM queue, 5 active totaling 400.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 50.0 |
| MW capacity | 25.0 |
| MFO | 50.0 |
| Submitted date | 4/27/2026 |
| Last updated | 5/28/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.