Wylie Ridge - Arroyo 138 kV
PJM queue ID C01-1100
Wylie Ridge - Arroyo 138 kV (C01-1100) is listed in the PJM interconnection queue as a 20 MW hydro project in Hancock County, WV. The filing names Wylie Ridge - Arroyo as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of February 28, 2029.
| Queue ID | C01-1100 |
|---|---|
| Project name | Wylie Ridge - Arroyo 138 kV |
| Status (as published) | Active |
| Substation | Wylie Ridge - Arroyo |
| Point of interconnection | Wylie Ridge - Arroyo 138 kV |
| County | Hancock |
| State | WV |
| Voltage | 138 kV |
| Capacity | 20 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalized for filtering) |
| Target commercial operation | 2029-02-28 |
| Source dataset | cycle |
Same substation and county
Hancock, WV: 4 requests in the PJM queue, 1 active totaling 20 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Current Hydro Project 19 LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 19.99 |
| MW capacity | 19.99 |
| MFO | 19.99 |
| Submitted date | 4/15/2026 |
| Last updated | 5/26/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.