Hancock, WV interconnection queue
1 active project totalling 20 MW in the PJM queue, plus 3 with terminal status (shown greyed).
1active projects
20active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| S124 | Aroyo-Wilie Ridge 138kV | 138 | 45 | Hydro | Withdrawn |
| C01-1100 | Wylie Ridge - Arroyo 138 kV | 138 | 20 | Hydro | Active |
| AG1-029 | Weirton Solar 24 kV | 24 | 13.6 | Solar | Withdrawn |
| AH2-038 | Weirton - Arroyo 25 kV | 25 | 5.4 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.