1 active project totalling 20 MW in the PJM queue, plus 3 with terminal status (shown greyed).

1active projects
20active MW
4total filed
Queue IDProjectkVMWResourceStatus
S124 Aroyo-Wilie Ridge 138kV 138 45 Hydro Withdrawn
C01-1100 Wylie Ridge - Arroyo 138 kV 138 20 Hydro Active
AG1-029 Weirton Solar 24 kV 24 13.6 Solar Withdrawn
AH2-038 Weirton - Arroyo 25 kV 25 5.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.