Substation Scout

Ada 12.47 kV

PJM queue ID C01-1064

Ada 12.47 kV (C01-1064) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Hardin County, OH. The filing names Ada as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 31, 2027.

Queue IDC01-1064
Project nameAda 12.47 kV
Status (as published)Active
SubstationAda
Point of interconnectionAda 12.47 kV
CountyHardin
StateOH
Voltage12.5 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-31
Source datasetcycle

Same substation and county

Hardin, OH: 39 requests in the PJM queue, 18 active totaling 715 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperCF OH Solar SR 81, Ada, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy9.5
MW capacity0.0
MFO9.5
Submitted date3/4/2026
Last updated10/2/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first