West Glasgow 25 kV

PJM queue ID C01-1043

West Glasgow 25 kV (C01-1043) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Barren County, KY. The filing names West Glasgow as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 27, 2027.

Queue IDC01-1043
Project nameWest Glasgow 25 kV
Status (as published)Active
SubstationWest Glasgow
Point of interconnectionWest Glasgow 25 kV
CountyBarren
StateKY
Voltage25 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-08-27
Source datasetcycle

Same substation and county

Barren, KY: 17 requests in the PJM queue, 5 active totaling 98 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperEDPR NA Distributed Generation LLC
Transmission ownerEKPC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy4.78
MW capacity0.0
MFO4.78
Submitted date3/3/2026
Last updated10/2/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first