Flemingsburg - Spurlock 138 kV
PJM queue ID AH1-666
Flemingsburg - Spurlock 138 kV (AH1-666) is listed in the PJM interconnection queue as a 48 MW solar project in Fleming County, KY. The filing names Flemingsburg - Spurlock as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2027.
| Queue ID | AH1-666 |
|---|---|
| Project name | Flemingsburg - Spurlock 138 kV |
| Status (as published) | Active |
| Substation | Flemingsburg - Spurlock |
| Point of interconnection | Flemingsburg - Spurlock 138 kV |
| County | Fleming |
| State | KY |
| Voltage | 138 kV |
| Capacity | 48 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | cycle |
Same substation and county
Flemingsburg - Spurlock substation: 3 requests in the PJM queue, 1 active totaling 48 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-429 | Flemingsburg - Spurlock 138 kV | 54 | Solar | Withdrawn |
| AH1-430 | Flemingsburg - Spurlock 138 kV | 36 | Battery | Withdrawn |
Fleming, KY: 12 requests in the PJM queue, 5 active totaling 281.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Fleming Solar, LLC |
|---|---|
| Transmission owner | EKPC |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 80.0 |
| MW capacity | 48.0 |
| MFO | 80.0 |
| Submitted date | 9/30/2019 |
| Last updated | 8/21/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.