Green Camp Solar II

PJM queue ID AH1-542

Green Camp Solar II (AH1-542) is listed in the PJM interconnection queue as a 22 MW hybrid project in Marion County, OH. The filing names Crissinger-Kirby as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2028.

Queue IDAH1-542
Project nameGreen Camp Solar II
Status (as published)Active
SubstationCrissinger-Kirby
Point of interconnectionCrissinger-Kirby 138kV
CountyMarion
StateOH
Voltage138 kV
Capacity22 MW
Resource (as published)Solar,Storage,Hybrid
Resource categoryHybrid (normalized for filtering)
Target commercial operation2028-03-01
Source datasetcycle

Same substation and county

Marion, OH: 17 requests in the PJM queue, 2 active totaling 84.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperRiverlake Energy, LLC
Transmission ownerATSI
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy110.0
MW capacity22.0
MFO110.0
Submitted date9/10/2021
Last updated9/1/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.