Green Camp Solar II
PJM queue ID AH1-542
| Queue ID | AH1-542 |
|---|---|
| Project name | Green Camp Solar II |
| Status (as published) | Active |
| Substation | Crissinger-Kirby |
| Point of interconnection | Crissinger-Kirby 138kV |
| County | Marion |
| State | OH |
| Voltage | 138 kV |
| Capacity | 22 MW |
| Resource (as published) | Solar,Storage,Hybrid |
| Resource category | Hybrid (normalised for filtering) |
| Target commercial operation | 2028-03-01 |
| Source dataset | cycle |
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Riverlake Energy, LLC |
|---|---|
| Transmission Owner | ATSI |
| Project Type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| Mw Energy | 110.0 |
| Mw Capacity | 22.0 |
| Mfo | 110.0 |
| Submitted Date | 9/10/2021 |
| Last Updated | 9/1/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.