Heritage Solar Farm
PJM queue ID AH1-334
Heritage Solar Farm (AH1-334) is listed in the PJM interconnection queue as a 8.1 MW solar project in Ocean County, NJ. The filing names Lakehurst - Whitings as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of August 30, 2027.
| Queue ID | AH1-334 |
|---|---|
| Project name | Heritage Solar Farm |
| Status (as published) | Active |
| Substation | Lakehurst - Whitings |
| Point of interconnection | Lakehurst - Whitings 34.5 kV |
| County | Ocean |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 8.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-08-30 |
| Source dataset | cycle |
Same substation and county
Ocean, NJ: 55 requests in the PJM queue, 15 active totaling 653.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Heritage Solar Farm, LLC |
|---|---|
| Transmission owner | JCPL |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 19.25 |
| MW capacity | 8.085 |
| MFO | 19.25 |
| Submitted date | 9/10/2021 |
| Last updated | 8/31/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.