Dulles Solar and BESS
PJM queue ID AH1-223
Dulles Solar and BESS (AH1-223) is listed in the PJM interconnection queue as a 20 MW battery project in Loudoun County, VA. The filing names Poland Rd-Runway DP as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of August 1, 2026.
| Queue ID | AH1-223 |
|---|---|
| Project name | Dulles Solar and BESS |
| Status (as published) | EP |
| Substation | Poland Rd-Runway DP |
| Point of interconnection | Poland Rd-Runway DP 230 kV |
| County | Loudoun |
| State | VA |
| Voltage | 230 kV |
| Capacity | 20 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-08-01 |
| Source dataset | cycle |
Same substation and county
Poland Rd-Runway DP substation: 3 requests in the PJM queue, 3 active totaling 100 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-147 | Dulles Solar and BESS | 60 | Solar | Partially in Service - Under Construction |
| AG1-221 | Dulles Solar and BESS | 20 | Battery | Partially in Service - Under Construction |
Loudoun, VA: 22 requests in the PJM queue, 10 active totaling 1,922.6 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | Active → EP |
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| MW energy | 0.0 |
| MW capacity | 20.0 |
| MFO | 150.0 |
| Submitted date | 9/8/2021 |
| Last updated | 7/28/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.