Evergreen Energy Center (AH1-125) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Loudoun County, VA. The filing names Sycoline as its point of interconnection. PJM lists its status as “UC”, with a target commercial operation date of March 15, 2026.
| Queue ID | AH1-125 |
|---|---|
| Project name | Evergreen Energy Center |
| Status (as published) | UC |
| Substation | Sycoline |
| Point of interconnection | Sycoline 34.5kV |
| County | Loudoun |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-03-15 |
| Source dataset | cycle |
Same substation and county
Loudoun, VA: 22 requests in the PJM queue, 10 active totaling 1,922.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Evergreen Energy Center, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| MW energy | 20.0 |
| MW capacity | 0.0 |
| MFO | 20.0 |
| Submitted date | 8/23/2021 |
| Last updated | 2/27/2026 |