Powerton 345 kV

PJM queue ID AG2-364

Powerton 345 kV (AG2-364) is listed in the PJM interconnection queue as a 120 MW solar project in Tazewell County, IL. The filing names Powerton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.

Queue IDAG2-364
Project namePowerton 345 kV
Status (as published)Active
SubstationPowerton
Point of interconnectionPowerton 345 kV
CountyTazewell
StateIL
Voltage345 kV
Capacity120 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-12-31
Source datasetcycle

Same substation and county

Powerton substation: 5 requests in the PJM queue, 2 active totaling 300 MW.

Queue IDProjectMWResourceStatus
AG2-363Powerton 345 kV180SolarActive
AH1-191Powerton 138 kV12.1HybridWithdrawn
AC1-171ZEP Valley Wind Farm10.3WindWithdrawn
W3-046Powerton 345kV0WindWithdrawn

Tazewell, IL: 5 requests in the PJM queue, 2 active totaling 300 MW.

A substation with the same name is named in PJM transmission planning materials: Powerton (COMED, 4 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperMackinaw Solar LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC2
StagePhase 3
MW energy200.0
MW capacity120.0
MFO200.0
Submitted date3/26/2021
Last updated9/11/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.