Powerton substation interconnection queue

2 active projects totalling 300 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
300active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG2-363 Powerton 345 kV 345 180 Solar Active
AG2-364 Powerton 345 kV 345 120 Solar Active
AH1-191 Powerton 138 kV 138 12.1 Hybrid Withdrawn
AC1-171 ZEP Valley Wind Farm n/r 10.3 Wind Withdrawn
W3-046 Powerton 345kV 345 0 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.