Prairie Creek Wind Phase 2

PJM queue ID AG1-433

Prairie Creek Wind Phase 2 (AG1-433) is listed in the PJM interconnection queue as a 17.6 MW wind project in Blackford County, IN. The filing names Keystone-DeSoto as its point of interconnection. PJM lists its status as “UC”, with a target commercial operation date of May 31, 2029.

Queue IDAG1-433
Project namePrairie Creek Wind Phase 2
Status (as published)UC
SubstationKeystone-DeSoto
Point of interconnectionKeystone-DeSoto 345 kV
CountyBlackford
StateIN
Voltage345 kV
Capacity17.6 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2029-05-31
Source datasetcycle

Same substation and county

Blackford, IN: 18 requests in the PJM queue, 10 active totaling 547.4 MW.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-26 Status change n/a EP → UC

Full change log →

Additional filed fields

DeveloperPrairie Creek Wind Farm II, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy100.0
MW capacity17.6
MFO100.0
Submitted date9/30/2020
Last updated10/21/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.