Prairie Creek Wind Phase 2
PJM queue ID AG1-433
Prairie Creek Wind Phase 2 (AG1-433) is listed in the PJM interconnection queue as a 17.6 MW wind project in Blackford County, IN. The filing names Keystone-DeSoto as its point of interconnection. PJM lists its status as “UC”, with a target commercial operation date of May 31, 2029.
| Queue ID | AG1-433 |
|---|---|
| Project name | Prairie Creek Wind Phase 2 |
| Status (as published) | UC |
| Substation | Keystone-DeSoto |
| Point of interconnection | Keystone-DeSoto 345 kV |
| County | Blackford |
| State | IN |
| Voltage | 345 kV |
| Capacity | 17.6 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2029-05-31 |
| Source dataset | cycle |
Same substation and county
Blackford, IN: 18 requests in the PJM queue, 10 active totaling 547.4 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-10-26 | Status change | n/a | EP → UC |
Additional filed fields
| Developer | Prairie Creek Wind Farm II, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 100.0 |
| MW capacity | 17.6 |
| MFO | 100.0 |
| Submitted date | 9/30/2020 |
| Last updated | 10/21/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.