Jade Meadow III Solar Facility
PJM queue ID AG1-363
Jade Meadow III Solar Facility (AG1-363) is listed in the PJM interconnection queue as a 220 MW hybrid project in Garrett County, MD. The filing names Black Oak-Hatfield as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of March 31, 2029.
| Queue ID | AG1-363 |
|---|---|
| Project name | Jade Meadow III Solar Facility |
| Status (as published) | Engineering and Procurement |
| Substation | Black Oak-Hatfield |
| Point of interconnection | Black Oak-Hatfield 500 kV |
| County | Garrett |
| State | MD |
| Voltage | 500 kV |
| Capacity | 220 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2029-03-31 |
| Source dataset | serial |
Same substation and county
Garrett, MD: 32 requests in the PJM queue, 13 active totaling 1,202.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 300 |
| MW capacity | 220 |
| MFO | 300 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.