Carnation

PJM queue ID AG1-351

Carnation (AG1-351) is listed in the PJM interconnection queue as a 34.8 MW solar project in Fairfield County, OH. The filing names Harrison-Good Hope as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of March 31, 2028.

Queue IDAG1-351
Project nameCarnation
Status (as published)Engineering and Procurement
SubstationHarrison-Good Hope
Point of interconnectionHarrison-Good Hope 138 kV
CountyFairfield
StateOH
Voltage138 kV
Capacity34.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-03-31
Source datasetserial

Same substation and county

Harrison-Good Hope substation: 2 requests in the PJM queue, 2 active totaling 85.2 MW.

Queue IDProjectMWResourceStatus
AF2-371Carnation50.4SolarEngineering and Procurement

Fairfield, OH: 10 requests in the PJM queue, 5 active totaling 607.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy58
MW capacity34.8
MFO142

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.