BL-Hileman Hollow
PJM queue ID AG1-281
BL-Hileman Hollow (AG1-281) is listed in the PJM interconnection queue as a 12 MW solar project in Blair County, PA. The filing names Claysburg-HCR Tap as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2027.
| Queue ID | AG1-281 |
|---|---|
| Project name | BL-Hileman Hollow |
| Status (as published) | Under Construction |
| Substation | Claysburg-HCR Tap |
| Point of interconnection | Claysburg-HCR Tap 46 kV |
| County | Blair |
| State | PA |
| Voltage | 46 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | serial |
Same substation and county
Blair, PA: 15 requests in the PJM queue, 2 active totaling 19.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 12 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.