Monmouth Solar 1
PJM queue ID AG1-223
Monmouth Solar 1 (AG1-223) is listed in the PJM interconnection queue as a 6.5 MW solar project in Monmouth County, NJ. The filing names Larrabee-Allaire as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2026.
| Queue ID | AG1-223 |
|---|---|
| Project name | Monmouth Solar 1 |
| Status (as published) | Under Construction |
| Substation | Larrabee-Allaire |
| Point of interconnection | Larrabee-Allaire 34.5 kV |
| County | Monmouth |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 6.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-12-31 |
| Source dataset | serial |
Same substation and county
Monmouth, NJ: 79 requests in the PJM queue, 18 active totaling 46.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 15.4 |
| MW capacity | 6.47 |
| MFO | 15.4 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.