South Combe

PJM queue ID AG1-191

South Combe (AG1-191) is listed in the PJM interconnection queue as a 6.5 MW solar project in Morris County, NJ. The filing names Chester-Pohatcong Mountain as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2025.

Queue IDAG1-191
Project nameSouth Combe
Status (as published)In Service
SubstationChester-Pohatcong Mountain
Point of interconnectionChester-Pohatcong Mountain 34.5 kV
CountyMorris
StateNJ
Voltage34.5 kV
Capacity6.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-12-31
Source datasetserial

Same substation and county

Morris, NJ: 22 requests in the PJM queue, 3 active totaling 14.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy15.4
MW capacity6.5
MFO15.4

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.