Buchanan County Solar
PJM queue ID AF2-382
Buchanan County Solar (AF2-382) is listed in the PJM interconnection queue as a 45 MW solar project in Buchanan County, VA. The filing names Hurley as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of September 30, 2029.
| Queue ID | AF2-382 |
|---|---|
| Project name | Buchanan County Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Hurley |
| Point of interconnection | Hurley 69 kV |
| County | Buchanan |
| State | VA |
| Voltage | 69 kV |
| Capacity | 45 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-09-30 |
| Source dataset | serial |
Same substation and county
Hurley substation: 4 requests in the PJM queue, 1 active totaling 45 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH2-277 | Hurley 69 kV | 42 | Hybrid | Withdrawn |
| AG2-299 | Hurley 69 kV | 30 | Battery | Withdrawn |
| AI2-343 | Hurley 69 kV | 15.3 | Solar | Withdrawn |
Buchanan, VA: 5 requests in the PJM queue, 1 active totaling 45 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 75 |
| MW capacity | 45 |
| MFO | 75 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.