Hurley substation interconnection queue
1 active project totaling 45 MW in the PJM queue, plus 3 with terminal status (shown grayed).
4 PJM queue filings name Hurley as the point of interconnection, all in Buchanan County, VA.
Target commercial operation dates as filed run from Mar 2024 to Sep 2029 (4 filings). 1 active filing targets a date after November 27, 2026.
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-382 | Buchanan County Solar | 69 | 45 | Solar | Engineering and Procurement | Sep 2029 |
| AH2-277 | Hurley 69 kV | 69 | 42 | Hybrid | Withdrawn | Mar 2024 |
| AG2-299 | Hurley 69 kV | 69 | 30 | Battery | Withdrawn | Sep 2024 |
| AI2-343 | Hurley 69 kV | 69 | 15.3 | Solar | Withdrawn | Dec 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Hurley” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Hurley: Expansion Tracker, PJM planning: AEP state not printed
Other PJM queue substations in Buchanan County, VA
No other substation in Buchanan County, VA is named as a point of interconnection in the PJM queue.