RHC Solar

PJM queue ID AF2-379

RHC Solar (AF2-379) is listed in the PJM interconnection queue as a 1.6 MW hybrid project in Somerset County, MD. The filing names Princess Anne as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 1, 2026.

Queue IDAF2-379
Project nameRHC Solar
Status (as published)Under Construction
SubstationPrincess Anne
Point of interconnectionPrincess Anne 25 kV
CountySomerset
StateMD
Voltage25 kV
Capacity1.6 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2026-12-01
Source datasetserial

Same substation and county

Somerset, MD: 35 requests in the PJM queue, 4 active totaling 96.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy3.9
MW capacity1.638
MFO3.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.