RHC Solar
PJM queue ID AF2-379
RHC Solar (AF2-379) is listed in the PJM interconnection queue as a 1.6 MW hybrid project in Somerset County, MD. The filing names Princess Anne as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 1, 2026.
| Queue ID | AF2-379 |
|---|---|
| Project name | RHC Solar |
| Status (as published) | Under Construction |
| Substation | Princess Anne |
| Point of interconnection | Princess Anne 25 kV |
| County | Somerset |
| State | MD |
| Voltage | 25 kV |
| Capacity | 1.6 MW |
| Resource (as published) | Solar; Storage |
| Resource category | Hybrid (normalized for filtering) |
| Target commercial operation | 2026-12-01 |
| Source dataset | serial |
Same substation and county
Somerset, MD: 35 requests in the PJM queue, 4 active totaling 96.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 3.9 |
| MW capacity | 1.638 |
| MFO | 3.9 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.