South Branch Solar

PJM queue ID AF2-375

South Branch Solar (AF2-375) is listed in the PJM interconnection queue as a 77.8 MW solar project in Hancock County, OH. The filing names Ebersole-Fostoria as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of February 28, 2026.

Queue IDAF2-375
Project nameSouth Branch Solar
Status (as published)Engineering and Procurement
SubstationEbersole-Fostoria
Point of interconnectionEbersole-Fostoria 138 kV
CountyHancock
StateOH
Voltage138 kV
Capacity77.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-02-28
Source datasetserial

Same substation and county

Hancock, OH: 19 requests in the PJM queue, 3 active totaling 159.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy129.6
MW capacity77.76
MFO129.6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.