CPV Backbone Solar

PJM queue ID AF2-356

CPV Backbone Solar (AF2-356) is listed in the PJM interconnection queue as a 105 MW solar project in Garrett County, MD. The filing names Albright-Mt. Zion as its point of interconnection. PJM lists its status as “Partially in Service - Under Construction”, with a target commercial operation date of November 30, 2026.

Queue IDAF2-356
Project nameCPV Backbone Solar
Status (as published)Partially in Service - Under Construction
SubstationAlbright-Mt. Zion
Point of interconnectionAlbright-Mt. Zion 138 kV
CountyGarrett
StateMD
Voltage138 kV
Capacity105 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-11-30
Source datasetserial

Same substation and county

Garrett, MD: 32 requests in the PJM queue, 13 active totaling 1,202.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy175
MW capacity105
MFO175

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.