SBC Solar

PJM queue ID AF2-325

SBC Solar (AF2-325) is listed in the PJM interconnection queue as a 4.2 MW hybrid project in Dorchester County, MD. The filing names Jacktown as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of December 31, 2027.

Queue IDAF2-325
Project nameSBC Solar
Status (as published)Engineering and Procurement
SubstationJacktown
Point of interconnectionJacktown 12 kV
CountyDorchester
StateMD
Voltage12 kV
Capacity4.2 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2027-12-31
Source datasetserial

Same substation and county

Dorchester, MD: 44 requests in the PJM queue, 8 active totaling 105.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy10
MW capacity4.2
MFO10

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.