Deep Lake Solar
PJM queue ID AF2-316
Deep Lake Solar (AF2-316) is listed in the PJM interconnection queue as a 82.7 MW solar project in Nicholas County, WV. The filing names Gilboa-Jones Branch II as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of February 28, 2029.
| Queue ID | AF2-316 |
|---|---|
| Project name | Deep Lake Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Gilboa-Jones Branch II |
| Point of interconnection | Gilboa-Jones Branch 138 kV II |
| County | Nicholas |
| State | WV |
| Voltage | 138 kV |
| Capacity | 82.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-02-28 |
| Source dataset | serial |
Same substation and county
Nicholas, WV: 7 requests in the PJM queue, 2 active totaling 137.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 150 |
| MW capacity | 82.7 |
| MFO | 150 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.