Substation Scout

Deep Lake Solar

PJM queue ID AF2-316

Deep Lake Solar (AF2-316) is listed in the PJM interconnection queue as a 82.7 MW solar project in Nicholas County, WV. The filing names Gilboa-Jones Branch II as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of February 28, 2029.

Queue IDAF2-316
Project nameDeep Lake Solar
Status (as published)Engineering and Procurement
SubstationGilboa-Jones Branch II
Point of interconnectionGilboa-Jones Branch 138 kV II
CountyNicholas
StateWV
Voltage138 kV
Capacity82.7 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2029-02-28
Source datasetserial

Same substation and county

Nicholas, WV: 7 requests in the PJM queue, 2 active totaling 137.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity82.7
MFO150

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.