South Dixon Solar
PJM queue ID AF2-182
South Dixon Solar (AF2-182) is listed in the PJM interconnection queue as a solar request filed at 0 MW (a net change or energy-only filing) in Lee County, IL. The filing names Nelson-Lee County II as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 31, 2029.
| Queue ID | AF2-182 |
|---|---|
| Project name | South Dixon Solar |
| Status (as published) | EP |
| Substation | Nelson-Lee County II |
| Point of interconnection | Nelson-Lee County 345 kV II |
| County | Lee |
| State | IL |
| Voltage | 345 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | cycle |
Same substation and county
Lee, IL: 106 requests in the PJM queue, 30 active totaling 2,565.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Deriva Energy Solar, LLC |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | TC1 |
| Stage | FINAL AGREEMENT |
| MW energy | 300.0 |
| MW capacity | 0.0 |
| MFO | 500.0 |
| Submitted date | 3/21/2020 |
| Last updated | 7/24/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.