Teays River Wind Farm (AF2-177) is listed in the PJM interconnection queue as a 26 MW wind project in Blackford County, IN. The filing names Sorenson-DeSoto #2 as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of September 17, 2030.

Queue IDAF2-177
Project nameTeays River Wind Farm
Status (as published)EP
SubstationSorenson-DeSoto #2
Point of interconnectionSorenson-DeSoto #2 345 kV
CountyBlackford
StateIN
Voltage345 kV
Capacity26 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2030-09-17
Source datasetcycle

Same substation and county

Blackford, IN: 18 requests in the PJM queue, 10 active totaling 547.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperTeays River Wind Farm LLC f/k/a Blackford County Wind Farm LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy200.0
MW capacity26.0
MFO200.0
Submitted date3/20/2020
Last updated2/24/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first