Substation Scout

Holland Solar Farm

PJM queue ID AF2-139

Holland Solar Farm (AF2-139) is listed in the PJM interconnection queue as a 3.7 MW solar project in Hunterdon County, NJ. The filing names Gilbert-Warren Glen as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 31, 2022.

Queue IDAF2-139
Project nameHolland Solar Farm
Status (as published)In Service
SubstationGilbert-Warren Glen
Point of interconnectionGilbert-Warren Glen 34.5 kV
CountyHunterdon
StateNJ
Voltage34.5 kV
Capacity3.7 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2022-08-31
Source datasetserial

Same substation and county

Hunterdon, NJ: 89 requests in the PJM queue, 26 active totaling 863.1 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy8.8
MW capacity3.7
MFO16.3

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.