Nuthatch Solar 5
PJM queue ID AF1-282
Nuthatch Solar 5 (AF1-282) is listed in the PJM interconnection queue as a 60 MW solar project in Highland County, OH. The filing names Stuart-Clinton as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of May 1, 2030.
| Queue ID | AF1-282 |
|---|---|
| Project name | Nuthatch Solar 5 |
| Status (as published) | Engineering and Procurement |
| Substation | Stuart-Clinton |
| Point of interconnection | Stuart-Clinton 345 kV |
| County | Highland |
| State | OH |
| Voltage | 345 kV |
| Capacity | 60 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-05-01 |
| Source dataset | serial |
Same substation and county
Stuart-Clinton substation: 3 requests in the PJM queue, 3 active totaling 290 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AC1-085 | Highland County Solar | 152 | Solar | In Service |
| AF1-283 | Highland 3 Solar | 78 | Solar | Engineering and Procurement |
Highland, OH: 40 requests in the PJM queue, 8 active totaling 857.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 100 |
| MW capacity | 60 |
| MFO | 100 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.