PJM queue ID AF1-249

Nickel Solar (AF1-249) is listed in the PJM interconnection queue as a 14 MW solar project in Warren County, OH. The filing names Nickel as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 18, 2024.

Queue IDAF1-249
Project nameNickel Solar
Status (as published)In Service
SubstationNickel
Point of interconnectionNickel 12.47 kV
CountyWarren
StateOH
Voltage12.5 kV
Capacity14 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-10-18
Source datasetserial

Same substation and county

Warren, OH: 2 requests in the PJM queue, 1 active totaling 14 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy19.92
MW capacity14
MFO19.92

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first